P-328 F-35C Facility Addition and Modification

Hinman provided AT/FP compliance and blast consulting services features in accordance with DoD Minimum Antiterrorism Standards for Buildings at NAS Lemoore.

This was a military, aviation project designed to a Low LOP with an overall Estimated Construction Cost of $16.6M.

The project included the renovation of Hangar 5, Module 1 to support the F-35C aircraft as well as providing two new addition structures to include a two-story, approximately 15,000 GSF of mission support space and a one-story, approximately 1,700 GSF combined canopy seat maintenance room and alternate mission equipment room (AME) with aircraft cooling yard.

Both additions were structurally isolated from the existing building and be of steel-framed/reinforced concrete masonry construction.

This was a military, aviation project designed to a Low LOP with an overall Estimated Construction Cost of $16.6M.