P-545 Aircraft Maintenance Hangar
Hinman performed AT/FP consulting services for the P-545 North and South Maintenance Hangars at Marine Corps Air Station in Yuma, Arizona.
This design build project for two 62,522 square foot new 2-story F-35 Joint Strike Fighter (JSF) compliant aircraft maintenance hangars included a high bay space, crew and equipment space, administrative space and Special Access Program Facility areas.
Hinman provided a cost- effective basis of design with the design team during the design and construction phases.
Hinman provided a cost- effective basis of design with the design team during the design and construction phases.
Hinman provided air-blast ‘proof-of- concept’ design for determination of loads distributed to supporting structure, review the conventional design and coordinate DoD AT/FP requirements with the team.
This facility had additional protective design requirements for Security Enhancements and Access Control elements between the installation and the more secure flight line/hangar area.
These flight line security upgrades addressed Space and Naval Warfare Systems Command (SPAWARS) flight line access control requirements for vehicle access and turn-stiles.